Road Construction

In the short term, the main objective is to complete the road based missing links of Yerevan western urban ring. The road projects which will help to divert through-traffic around the city center are:

  • Shirak street extension
  • Artashat Highway reconstruction and widening
  • Arshakunyats Avenue- reconstruction and widening of the road final section
  • Davitashen-Ashtarak road link construction
  • Babajanyan-Ashtarak road link construction

The construction of an Estacada in the crossroad of Arshakunyats-Garegin Nzhdeh and Arshakunyats-Bagratunyats crossroads is foreseen within the framework of the project.

Shirak Street Extension

(New road section construction)

  • Length – 1․2 km
  • Carriage way width – 15 m
  • Both sided traffic
  • 4 lanes traffic
  • 2 tunnel passages
  • Estacada in the section of railway station

Artashat Highway

(Reconstruction/widening of the existing road section)

  • Length – 2.3 km
  • Carriage way width – 21 m
  • Both sided traffic
  • 5 lanes traffic

Arshakunyats Avenue

(Reconstruction/widening of the existing road section)

  • Length – 1.4 km
  • Carriage way widening
  • Both sided traffic
  • 5-8 lanes traffic

Argavand-shirak

(New road section construction)

  • Length-2․7 km
  • Carriage way width 28m
  • Both side traffic
  • 6 traffic lines and service road
  • 1 traffic junctions
  • 1 steel bridge over Hrazdan River

Davitashen -Ashtarak

(New road section construction)

  • Length-5.4 km
  • Carriage way width 28m-22m
  • Both side traffic
  • 6 traffic lines and service road
  • 2traffic junctions

Babajanyan-Ashtarak

(New road section construction)

  • Length-9․4 km
  • Carriage way width-14m21m
  • Both side traffic
  • 4-6 traffic lines
  • 5 overpasses
  • 1 traffic junction

After project completion the traffic in Yerevan will be more regular and uninterrupted through Yerevan western urban ring starting from Ashtark highway to Artashat highway.

News

Working Visit

Working visit Regular working visits to the construction site are ongoing. Asian Development Bank representative Marie Pia Ancora, with the representatives of Sustainable Urban Development Investment Project, construction and supervision companies, visited...

Working Visit

Today representatives of Asian Development Bank visited Babajanyan-Ashtarak road link to get acquainted with the progress of the construction works. After completion of the construction works the length of the road will be 9․4 km, the width of the carriage...